Used for roasting of cored peppers by loading on 100mm height stainless steel studs, which are excentricly installed on dual chain tracks, with 100mm spacing. Inner surface of the tunnel is supplied with 1400 C heat resistant firebrick and outer surface is filled with 50mm glasswool for isolation. Machine will be supplied with single stage lpg, lng, cng, natural gas burner, …